| Airport Transit Hotel Kuwait International Airport |
|
| Project Details: |
|
| Project Type : |
Recreational |
| Location of Project : |
Kuwait Investment Authority, Kuwait |
| Contractor(s): |
Al-Marwa Trading Contracting Co. |
| Consultant: |
Kuwait Engineering Group |
| Total Project Cost : |
KD. 3,192,400/- |
|
| Project Description: |
- The building consists of two basements, mezzanine and 5 floors, total built-up area is 12,000 M² (Approx). The structure is entirely of in-situ reinforced concrete, cladded with bush hammered precast white concrete panels above ground level.
- The building has been provided with all services which are required from such prestigious buildings Basement Floor: Offices, Employee Cafeteria, Stores, Electric Generator, T.V. Lounge and Water Pump sets. Ground Floor: Kitchen, Restaurant, Waiting Hall, Reception and Information Counter and Airways Companies, Civil Aviation and Security Offices.
- Typical Floor: 5 floors, 40 rooms per floor, one service room per floor. For 5th floor, common door between each two doors by opened as per guest request. Elevators: Three for passengers, one for passengers / services, and one for services. Other special works done by Timline(Formerly KFTCIC): Interior design and tendering of furniture fixture and equipment.
|
|
|
| Image Gallery | 
| 
|
|